LEATHERNECKFEDERAL CONSULTING

Capabilities brief · September 2026

VOSB + SDVOSB certified · SBA VetCert Certified September 2026 – September 2029 SAM registration active · SC LLC · Est. May 2026 UEI VU2HV8458J93 · CAGE 21BA0

Federal Compliance. Executed Precisely.

The requirements connect.So should the execution.

Leatherneck Federal Consulting helps small and mid-sized businesses win and keep federal work. We start with an honest, evidence-backed baseline across the things that actually decide a pursuit — market fit, accounting, bonding, insurance, wages, safety, export controls and CUI — then give you a prioritized route with a cost and a timeline. Construction and EPC is our deepest configured vertical.

The LFC OORAH framework

Five phases. One controlled route.

Screened, designed, built, rehearsed, sustained — in that order, every time.

01 · O

ORIENT

Scope and baseline

Where you stand before you spend a proposal dollar. Market path, infrastructure, regulatory exposure, safety, and a bounded cyber screen — ending in a prioritized gap register.

02 · O

ORGANIZE

Plan and architect

The gap list becomes a program your team can run: owners, budget, sequence, architecture, dependencies, and an evidence plan.

03 · R

REMEDIATE

Implement and document

The plan gets executed, not re-planned. Work packages implemented, operating documentation written, evidence mapped control by control.

04 · A

ASSESS

Validate and rehearse

The rehearsal before the real review. We walk the evidence, test the operating story, and leave you a corrective path before the external decision point.

05 · H

HOLD

Sustain and monitor

The posture stays alive after the sprint: evidence rhythm, affirmation, SPRS upkeep, change control, and escalation.

Program-build domains. Export control, document control, access control, program setup, and execution evaluation thread through all five phases, but each is a separately scoped module. They fire only when the route, the target contract, or an evidence gap justifies the spend — no base phase silently absorbs them. A full NIST SP 800-171 110-control assessment is its own module, not part of standard ORIENT.

What we will not claim

The limits are part of the method.

A framework that promises everything is worth nothing.

No guarantees

No phase guarantees an award, a contract, a certification, an accounting approval, a safety certification, a legal outcome, revenue, or margin.

No “ITAR certification”

Export-control work is screened, never certified. Registration, licensing, and jurisdiction or classification determinations stay with you and your counsel. We never market an ITAR certification.

An honest deferral

If there is no viable federal path inside your working horizon, we will tell you so — as a finding, not as a discount on custom work.

Current CMMC posture. CMMC Phase II third-party assessments are suspended (13 July 2026), and a class deviation memorandum of 3 September 2026 directs contracting officers to remove Phase II requirements from solicitations and contracts. Level 1 and Level 2 self-assessment, baseline NIST SP 800-171 Revision 2 compliance, SPRS, the DFARS 252.204-7012 safeguarding obligation, and the annual affirmation remain in force. Third-party assessment is not currently the operative requirement, so we do not market a C3PAO or DIBCAC designation. CMMC work is scoped only after a current-posture check.

Who we work with

Two ways in.

Small and mid-sized businesses entering federal work

Find out what is actually standing in the way.

Moving from subcontractor to prime, responding to a lost bid, or already performing and needing a structured baseline before the next pursuit. We start with a bounded diagnostic, not a proposal.

Primes and federal program teams

Add focused execution capacity.

Compliance, acquisition, and secure-technology capability under a clear scope, without obscuring roles or accountability. A certified SDVOSB subcontractor with federal contract administration on the bench.

Who does the work

Principal-led, not handed off.

Our principal is named. The rest of the bench is not, and we do not dress that up.

Douglas J. Henderson

Principal · President & CEO

Twenty-plus years leading federal contracts, procurement, subcontract management, and audit and compliance programs across the nuclear, defense, aerospace, and industrial sectors. Contracts Manager at DCMA, and earlier directed procurement and the glovebox program at the Savannah River Plutonium Processing Facility.

Credentials

Held by our principal

PMP (2023) · DAWIA Level III, 1102 · J.D. Corporate Law, Tax & IP, N Kentucky University · MBA Corporate Finance & Leadership, Butler University · B.S. Computer Science & Finance, College of Charleston · USMC veteran.

What we are, plainly

Stated, not implied

LFC was formed in May 2026 and claims no entity federal past performance. Under FAR 15.305(a)(2)(iv) an offeror without a relevant record may not be evaluated favorably or unfavorably on it. Principal experience is not entity past performance, and we label the two separately.

The next step

Start with the diagnostic. It is bounded, it is credited in full toward the next step if you proceed within 90 days, and it ends in a prioritized route rather than a proposal.

Book a 30-minute call

leatherneckconsulting.com/schedule

Talk to us

inquiries@leatherneckconsulting.com

Entity

UEI VU2HV8458J93 · CAGE 21BA0

VOSB + SDVOSB certified, SBA VetCert

Boundary. LFC OORAH is a common-law trademark of Leatherneck Federal Consulting LLC; registration pending. Nothing in this brief is legal, accounting, tax, or safety advice, and nothing in it is an offer, a quote, or a guarantee.